Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 27 results ...

Abohilal, S A (2017) Investigating the roles of leaders, managers and their mutual roles in aligning strategy and project management in public sector organisations: the case of the Kingdom of Saudi Arabia, Unpublished PhD Thesis, , Brunel University.

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis, Unpublished PhD Thesis, , Brunel University.

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials, Unpublished PhD Thesis, , Brunel University.

Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities, Unpublished PhD Thesis, Business School, Brunel University.

Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects, Unpublished PhD Thesis, , Brunel University.

Almutairi, A M S (2017) Protecting the rights of temporary foreign 'low-skilled' workers in the Saudi construction industry: a case for legal reform, Unpublished PhD Thesis, Department of Politics, History and Law, Brunel University.

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK, Unpublished PhD Thesis, , Brunel University.

Clark, G G (1993) Rule-based integrated building management systems, Unpublished PhD Thesis, , Brunel University.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

Jashapara, A (1995) Learning in organizations: A study of the UK construction industry, Unpublished PhD Thesis, Henley Management College, Brunel University.

Mesa Jiménez, J J (2021) Artificial intelligence for optimisation and demand side response in built environment, Unpublished PhD Thesis, , Brunel University.

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD, Unpublished PhD Thesis, , Brunel University.

Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

  • Type: Thesis
  • Keywords: construction procurement; contracting methods; general contracting; management contracting; performance
  • ISBN/ISSN:
  • URL: http://bura.brunel.ac.uk/handle/2438/5315
  • Abstract:
    This research pursues the development of management contracting in the UK construction industry and aims to compare it with the traditional method with a view to providing some indication of how both systems may be matched to particular circumstances. A theoretical model was used to assist in comparing project performance in a case study sample of 39 management contracts and 30 traditional form of contracts, and have identified several variables which could influence the performance of a project. The first main hypothesis proposed is that management contracting can satisfy clients who need their projects quickly and for projects that are large and/or highly complex. This led to a second hypothesis, that project performance is a function of the characteristics of the client, the project, the designers, the contract procedure employed and the procurement method adopted for their projects. The use of management contracting is growing throughout the UK, but the percentage of traditional contracting is still greater than other forms of building procurement method. Analysis of the 69 case studies suggest that management contracting performs better in some respect than traditional contracting, in particular, when time is the essence of the contract and when the project is highly complex. However, in the construction of large simple buildings, there was no strong evidence which shows that management contracting can perform better than the traditional form of contracts. Moreover, analysis of the results also suggests that procurement method is not the only variable affecting project performance. The client's requirements, the designer, the characteristics of the project and the contract procedure employed, all had their relative effect on certain performance measures as defined by time, cost and quality.

Nathan, P (1991) Project planning and control systems: An investigation into their application and implications of usage in the UK construction industry, Unpublished PhD Thesis, , Brunel University.

Paling, D R (1982) Industrial relations in the building, civil engineering and engineering construction industries, Unpublished PhD Thesis, , Brunel University.

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

Sawacha, E O-O (1993) An investigation into safety attitudes and safety performance in the construction industry, Unpublished PhD Thesis, Department of Mechanical Engineering, Brunel University.

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry, Unpublished PhD Thesis, , Brunel University.

Zhao, Y (2022) An ontology-based semantic building post-occupancy evaluation framework and its application, Unpublished PhD Thesis, , Brunel University.